CASE STUDIES
CASCADE
COFFEE
SITUATION OVERVIEW
-
CMS began the relationship with Cascade Coffee in 2012
-
At the time, Cascade had two meters on a Rate 41 Sales with Puget Sound Energy
-
CMS performed a full review of their accounts and provided recommendations
-
To date, CMS has saved Cascade Coffee over 15% annually on gas cost alone
TASK
AT HAND
-
Reliable natural gas supply is critical to Cascade Coffee’s business
-
Natural gas represents a significant percentage of their cost of goods sold, and finding ways to minimize cost was critical to their objectives
ACTIONS
TAKEN
-
CMS reviewed multiple rate schedules for Cascade to determine the cost difference between firm service with Puget Sound Energy and the lower cost Interruptible Service offered
-
CMS ran an ROI analysis on the annual savings achieved by creating a master meter to handle the volumes of both meters
-
CMS helped initiate the process with PSE to make the consolidation happen
-
CMS purchased their commodity needs well below the Utility
END
RESULTS
-
Cascade weighed the options CMS provided and decided to stay with Firm Service to meet their customer’s needs
-
Since 2013, Cascade Coffee consolidated the two meters into one and have saved over $20,000 annually
-
CMS’s Commodity purchasing has netted an additional $18,000 average annual cost reduction over the past eight years